Bearing >Dental Bearings > Handpiece Bearing Maintenance
1.Clean external surfaces of handpiece.
2.Insert bur into chuck.
a.Spray handpiece cleaner or cleaner/lubricant into drive air turbine for 1 to 2 seconds.
b.Operate handpiece within a paper towel or other cover to purge used lubricant and debris.
c.Repeat the spray/operation procedure until expelled fluid is absolutely clear.
d.Wipe external surfaces to remove expelled fluid.
e.Operate handpiece for 3-5 seconds, repeating until all fluid has been expelled.
5.Cool handpiece to room temperature.
7.Operate handpiece for 5 to 10 seconds within paper towel or other cover to purge excess lubricant.
9.Handpiece is ready for use.
rotex 780 handpiece bearings. dental tool bearings. ceramic dental bearings. dental high speed bearings. smooth dental bearings. miniature dental bearings. dental drill bearing. bearing dental. bearing dental tools manufacturer. 7x4x2 dental bearings. dental bearing suppliers
Contact Us:
PYC BEARING CO.,LTD.
ADD : Room 2207,No.1065( A)
Zhao Jia Bang road,
Shanghai,P.R.China
TEL : 0086-21-64692915
FAX : 0086-21-51062733
E-mail :
sales@bearings-china.com